TPCCCM5 project is an expanded cement mill system besides No. 4 mill contracted by Sinoma Tianjin. There are a lot of problems, such as, limited space, the matching with old line, the dust issue from the old etc. However; the load test running of the cement mill was successfully conducted despite those difficulties.